Copper gets called the metal of electrification, and that’s true enough. But the more interesting mismatch isn’t whether demand shows up — it’s when supply can respond to it.
The IEA projects global copper demand rising from 26.7 Mt in 2024 to 31.3 Mt by 2030, a 17% increase in six years. Supply doesn’t move on that timeline. It can’t.
Why the Gap Is Structural, Not Cyclical
Put those together, and the IEA’s own outlook points to a 25–30% supply deficit by 2035, based on the current project pipeline.
The Valuation Implication
The value doesn’t sit in the price deck — it sits in when a mine’s cash flows actually start.
A project that’s permitted and financed today still won’t produce a ton of copper before the mid-2030s. Mine-level timing, not the long-run copper price assumption, is what should be doing the heavy lifting in the model.
Copper’s structural story, then, may have less to do with electrification demand — which is well understood and well priced-in by now — and more to do with how slowly the supply side is built to respond to it.
— Kalale Research